位置: 首页 > 南京MBA > 南京mba培训排行
南京mba培训排行
预约试听

南京mba培训排行


考前准备

1.认识自我

首先要明确的是我为什么要考MBA,我希望能从MBA获得什么,学了MBA之后干什么。这几年考MBA的人越来越多,学校根本就不愁招不到人,那么浙大为什么选我,不选别人,我的优势在哪里?

2.网申材料准备

(1)熟悉学校、熟悉招生简章

太奇面试班的胡老师多次说到要做到知己知彼,知道浙大是一个什么样的学校,MBA项目的特色,然后看看自己身上有什么和他匹配的地方。在准备网申材料的时候可以重点写一下。在面试的自我介绍里也可以多准备一下。

(2)适当的美化材料

这个太奇的老师都很专业,听老师的话,没有错。

公司介绍等内容不要招搬网上的东西,要有自己的总结和想法。

(3)推荐信

找2个靠谱的、熟悉自己的,你能找到的社会地位**高的人来写。

3.面试

(1)太奇的提前批面试课程都很完善,认真上课,不要漏课。老师布置的作业一定要认真准备。

(2)熟悉自己的行业,结合当下的时政、热点问题等对自己所处的行业的前景、发展方显进行分析。

(3)自我介绍要连贯、有亮点。(如果有美化的地方,一定要把前后故事编顺了)

(4)认证对待模拟面试。重视每一次模拟面试,听取老师的意见,调整自己的逻辑思维方式。

    完善的教学环境

    南京mba培训排行

    精心布置的教室,丰盛的茶水点心

高端定制班

南京mba培训排行

大学英语六级联考阅读理解模拟练习题68(附答案)



In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

1. The main difference between panel method and the method discussed in the last paragraph ispx____.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter

2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.

3. According to the passage, the principle of system building is thatpx____.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site

4. The usual fixed length in the modular system ispx____.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters

5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.

答案:1. A 2. C 3. B 4. D 5. A
 


相关推荐:


南京MBA培训   南京MBA培训班   南京MBA培训机构

南京华章MBA培训

进入机构首页
南京华章MBA培训中心

上课地址:广州路37号江苏科技大厦2602

预约试听

倒计时:
11 : 58 : 41
其他试听课程
机构全部课程

学校课程导航